City of Cameron issued the following announcement on June 24.
Ground Storage Pump Modifications
Project is Wholly Funded by the Drinking Water State Revolving Fund (DWSRF) thru the Texas Water Development Board (TWDB)
Description of Project:
- Installation of One (1) Variable Frequency Drive for Existing Vertical Turbine Pumps including Electrical Conduit Modifications, Instrumentation, Control Panels, Modifications to Existing Buildings, Removal and Disposal of Existing Electrical Components
- Installation and Coordination with Oncor Electric for New Service Drop at Ground Storage Facility.
- Site Preparation and Cleanup at Ground Storage Facility